<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=iso-8859-1">
<META content="MSHTML 5.50.4522.1800" name=GENERATOR>
<STYLE></STYLE>
</HEAD>
<BODY bgColor=#ffffff>
<DIV>Rob,</DIV>
<DIV>I have the mast beam fix and will be in Solomon's as you know. You are 
welcome to have a look see.</DIV>
<DIV>Alan<BR><FONT face=Arial size=2>*********** REPLY SEPARATOR 
***********<BR><BR>On 5/21/2001 at 8:06 PM R.C. Alley wrote:</FONT></DIV>
<BLOCKQUOTE 
style="PADDING-LEFT: 5px; MARGIN-LEFT: 5px; BORDER-LEFT: #000000 2px solid">
  <DIV><FONT face=Arial size=2>And a fine thing it is, too.  I would like 
  to see the pictures; I have # 219, and would like to see what # 222 looks 
  like, and I may have to do the same job some day--maybe next 
year.</FONT></DIV>
  <DIV><FONT face=Arial size=2></FONT> </DIV>
  <DIV><FONT face=Arial size=2>Rob Alley</FONT></DIV>
  <BLOCKQUOTE 
  style="PADDING-RIGHT: 0px; PADDING-LEFT: 5px; MARGIN-LEFT: 5px; BORDER-LEFT: #000000 2px solid; MARGIN-RIGHT: 0px">
    <DIV style="FONT: 10pt arial">----- Original Message ----- </DIV>
    <DIV 
    style="BACKGROUND: #e4e4e4; FONT: 10pt arial; font-color: black"><B>From:</B> 
    <A title=SwiftLaw@aol.com 
    href="mailto:SwiftLaw@aol.com">SwiftLaw@aol.com</A> </DIV>
    <DIV style="FONT: 10pt arial"><B>To:</B> <A title=Public-list@alberg30.org 
    href="mailto:Public-list@alberg30.org">Public-list@alberg30.org</A> </DIV>
    <DIV style="FONT: 10pt arial"><B>Sent:</B> Monday, May 21, 2001 10:43 
    AM</DIV>
    <DIV style="FONT: 10pt arial"><B>Subject:</B> [Alberg30] Deck Beam 
    finished</DIV>
    <DIV><BR></DIV><FONT face=arial,helvetica><FONT size=2>Progress made: 
    Washington Aluminum Company forwarded the two precut 3/8 <BR>aluminum plates 
    for the Deck Beam. Per the expert advice on this list and a <BR>few calls 
    with some of the members, I blew off the yard and effected the <BR>repair 
    myself. <BR><BR>Prepared old surface by hand (No chemical treatments) while 
    the jack rig <BR>stayed in place for 5 days increasing the pressure by a 
    half turn a day. The <BR>aluminum plate did not need much grinding, but 
    accomplished what was <BR>necessary on board. Clamped up the plates "dry" 
    and marked for drilling. Then <BR>pre-drilled nine holes on a drill press 
    (seven holes Aft to Forward and two <BR>Stern to Forward) .  Important 
    equipment was the 14" drill bit, brand name <BR>"The Aggressor." 
     Re-laid up the plates dry. Prepared West Epoxy mixture and <BR>applied 
    to surfaces both roughed up for the application. <BR><BR>The drilling was 
    time consuming but not extremely difficult. Finally reset <BR>the plates and 
    drove through all nine 3/8' stainless hex bolts with washers <BR>for and 
    aft. Applied torque by hand. Released the Jack mount. Closed the <BR>forward 
    cabin door for the first time ever I think. It looks like it was 
    <BR>installed by the factory.  Yard Boss pissed that we were right. We 
    are please <BR>to know the boat better and Launch this Thursday. !!!! 
     Thank you all so very <BR>much. I took pictures. I can post if any 
    interest. <BR><BR>Tom Swift <BR>#222</FONT> </FONT></BLOCKQUOTE><FONT size=2 
  Arial></BLOCKQUOTE></FONT></BODY></HTML>